A lot has happened since last we posted.
Framing was completed, rough plumbing, rough electrical, and rough mechanical. A lot of grading had to be reworked on site as a result of tremendous rains. All of our windows with exception of one are in, and the exterior doors will be on in a matter of days.
The [...]

Insulation has begun.....

Insulation has been applied in the upper level of the house, and framing is complete in all but the upper level. Finishing the cutting for windows now…..lots of work to be done to the site as we have a forecasted break from the rain for a few days…..

Still Raining...

Unreal. At any rate, we are making significant headway and should see the framing complete, stairs in, electrical and plumbing rough done in a week. The interest in our product line is increasing almost daily, and we are preparing to roll out a line of plans which we will post on our website once complete.  [...]

No time for words...
Moving Right Along

Well, it has been a very busy week or so, and an extremely productive one at that. June 4 and 5 DwellBox team members headed to Atlanta and participated in the launch of an extremely progressive design studio. The program is a collaboration between Emory University, the City of Atlanta, and the Community Design Center [...]

Work Continues

Worked today on cutting for stairwells and vertical supports. Primarily metalwork for the next week or so.

Shaping up Nicely!

Friday Morning started out very well. Gary from Boone Crane was ready by 8am, and by 8:30, the team had ISBU’s moving. With very minimal wrangling, the first two ISBU’s were up and set on the foundation. Our up front work paid off as the foundation, and anchoring assemblies were all within a 1/16″ tolerance. [...]

Forms off...slab getting prepped

After a successful pour of the foundation on Friday, the forms were removed, and the basement slab has been prepped for the plumber to come and rough in.
Monday was a great weather day, and we had a lot of activity onsite. First thing in the morning a second ISBU was brought in for the welders [...]

Poured

Not a lot of time to write today….got the foundation poured yesterday….over 35 yards of concrete….lots of #9 steel….this house won’t be going anywhere!…Forms come off tomorrow, waterproofing and backfill will be Monday. Big day on Tues…..Crane and all 5 boxes go up!….busy busy..stay tuned. Thanks to Garrett, Gary, Chandler, Coastal Carolina Pumping, and Clemens [...]

Muddy May but it's all ok

Footers have been dug, inspected, and poured. Forms for foundation have been erected, and we await the building inspector as I write this so we can pour. In the meantime, The ISBU which will house the kitchen , stairwell, etc. has been modified a great deal. By having this work take place while the footer [...]