Pouring rain today, but the works is dry on the inside! T&G bamboo started in this morning, should be mostly done this afternoon. We are waiting on about 120 sf of the material from the supplier, but we wanted to go ahead and get the flooring in for the kitchen and bath, so we can [...]
The view here is of the kitchen with the first of the cabinets going up. Finish floor has to go in prior to putting in the base units. Vertical trim still needs to be added as well.
This is a low res. view of the bedroom, vertical trim still needed.
Living room full of tools, trim going [...]